Now on the App Store & Google Play

The Habit Tracker for Minds
That Work Differently

Habjour is built with extra care for the neurodivergent community. Encouraging messages, meaningful gamification, and sensory-friendly design help you build habits that actually stick.

Habjour Home Screen Habjour Unlocking a Message Habjour Theme Worlds
🔒 Data stays on your device
🚫 No tracking, no ads
📱 Works fully offline
☁️ Optional Google Drive backup
🌙 Cycle-aware messages
🌍 27 Languages

Designed for Your Brain

Every feature is built to work with you — not against you.

🎨

Sensory-Friendly Design

Muted colors, reduced animations, adjustable text size and spacing. Dark mode included. Neurodivergent-friendly color scheme in reports: no red, no yellow.

🔇

Everything Is Optional

Sounds, haptics, notifications, challenges, messages — all individually toggleable. You decide what you need.

🛡️

No Pressure, No Punishment

Automatic streak protection and no penalty system. Missed a day? No problem.

📚

Ready-Made Habits

Over 60 templates across 11 categories, so you don't have to start from scratch.

🎯

Focus Mode

Less UI, more clarity. Shows only what matters — perfect when you're feeling overwhelmed.

💭

Understand Your Patterns

Track why you skip and rate difficulty, energy, mood, and social context. Over 50 personalized tips based on your patterns.

More Than a Habit Tracker

Features that actually keep you going — without stressing you out.

Messages as Rewards

Every completed habit unlocks a new message — encouraging words that celebrate your progress. 8 themed worlds with over 150 messages, all saved in your journal to re-read anytime.

Meaningful Gamification

Earn XP, level up, and unlock new themes. Over 100 achievements, streaks with automatic streak protection, and weekly challenges keep motivation high.

Weekly Challenges

Three rotating mini-challenges per week: Streak Builder, Early Bird, and Completion Blitz. Small goals that keep you motivated — without pressure.

Habit Library

Over 60 pre-built habits across 11 categories — including a new social activities category — or create your own. Each habit can be tracked up to 5 times per day, e.g. drinking water.

Made for Everyone

Personalized 7-step onboarding and focus mode. Every feature is optional: messages, notifications, challenges, sounds, and haptics can all be turned off completely. Dark mode, muted colors, customizable text size, spacing, and reduced animations.

Understand Your Patterns

Track why you skip habits and get personalized insights. Weekly patterns, over 50 tips, and AI-powered pattern analysis. Social context shows whether you're more productive alone or with others.

Cycle Awareness

Habjour adapts messages and analytics to your menstrual cycle. Gentler words when your body needs them — optional and private.

AI Tips for Habits

Get practical implementation tips for each habit — AI-generated, designed for the neurodivergent community. Personal notes and therapist notes in separate tabs.

Homescreen Widget

Check off habits right from your home screen — no need to open the app. Perfect for quick routines.

Google Drive Backup

Optional cloud backup to your own Google Drive. Your data, your account — we have no access.

Self-Assessment

Rate difficulty, energy level, mood, and social context after each completion. Step by step, one question at a time. Therapeutically valuable data without overwhelm.

Progress Report (PDF)

Generate a PDF report in compact or detailed mode. Strength-based language, social context analysis, weekday and monthly patterns, self-assessment insights. Choosable color scheme: neurodivergent-friendly (no red/yellow) or clinical. View sample report

How It Works

Build your daily routine in three steps.

Add a Habit

Choose from the library or create your own. Set how often and on which days.

Check It Off Daily

Tap the checkbox — in the app or directly from the widget on your home screen.

Unlock a Message

Every completion rewards you with an encouraging message from your chosen theme world.

A Look Inside

Daily Overview
Daily Overview & Challenges
Habits
Manage Your Habits
Message
Unlock a Message
Progress
Your Progress
Achievements
Unlock Achievements
Analytics
Analytics & Insights
AI Analysis
AI Pattern Analysis
Theme Worlds
8 Theme Worlds
Settings
Customizable Display
Cycle Awareness
Cycle Awareness
AI Tips
AI Tips
AI Tips Regenerate
Generate Tips

Simple Pricing

The basic version is free. Premium as a one-time purchase with cloud backup, or Plus subscription for AI analysis.

Free

Free

$0
forever
  • Up to 10 habits
  • 3 theme worlds
  • Streaks & level system
  • Homescreen widget
  • Reminders
Download Now
Founder Deal

Premium Lifetime

$19.99
Founder price for early supporters
  • Unlimited habits
  • All 8 theme worlds (level-gated)
  • Cloud Backup (Google Drive / iCloud)
  • Advanced analytics & PDF progress report
  • Self-assessment (difficulty, energy, mood, social context)
  • Export & import data
  • All future updates

Planned regular price after launch: $49.99

Download Now

Individual themes also available separately — $1.99 each (permanent purchase)

New

For Therapists & Professionals

Create custom habit plans, share them via QR code, and track your clients' progress. Privacy-compliant and without personal data.

📋

Create Plans

Build custom habit plans from a library of 60+ templates or your own entries. Set frequency, time of day, and add therapist notes.

📱

QR Code Sharing

Share plans and receive progress reports via QR code. Clients scan the code and instantly have the plan on their device.

👥

Client Management

Manage your clients with aliases, assign plans, and import shared progress reports. Everything stored locally on your device.

📊

Progress Reports

Import reports in compact or detailed mode. Strength-based language, social context analysis, weekday patterns, and stability metrics. Choosable color scheme: clinical (default) or neurodivergent-friendly. Ready to use as a conversation basis.

🔑

License Codes for Clients

Generate license codes directly in the app. Clients receive Premium Plus access without needing their own subscription.

🔒

Privacy by Design

No name, no email, no device ID. QR codes contain only compressed plan data. GDPR-compliant, no third-party servers.

💡

AI Tips for Clients

Generate AI-based implementation tips directly when creating plans. Optionally disable AI tips per habit so clients only see your notes.

🌐

Report Translation

Translate imported reports directly in the app. 27 languages, AI-powered. Ideal for multilingual therapeutic settings.

Plan overview
Plan Overview
Habit library
50+ Templates
QR code sharing
Share via QR Code
Client detail
Client Management
Progress report
PDF Report
AI Tips in Therapist Mode
Generate AI Tips
Disable AI Tips
Control AI Tips per Habit
5 seats $14.99/month
15 seats $34.99/month
30 seats $54.99/month
100 seats $129.99/month

The Story Behind Habjour

Marcel Simmendinger

Hi, I'm Marcel.

I'm a software developer, a father, and the person behind Habjour.

The idea for this app didn't come from a business plan. It came from a very personal experience. As the father of a neurodivergent child (ADHD / autism spectrum), I was looking for a way to support everyday routines. Things like self-care, taking medication, or simply managing small daily steps.

What I found were plenty of habit trackers. But most of them didn't feel right for our situation: too rigid, too performance-oriented, or simply not designed for lives where energy, focus, and daily capacity fluctuate significantly.

So I started building something myself.

Habjour was born from the desire to create a tool that supports rather than pressures. An app that understands that progress sometimes means simply managing one small step.

My goal is to build a tool that helps the neurodivergent community make their daily lives a little more stable and a little more friendly.

Marcel Simmendinger
Solo Developer & Founder, Kamacit Studio

Ready for Your Adventure?

Download Habjour and discover gamification, encouraging messages, and sensory-friendly design for your habits.